Petra Indah Bridge
The first design solution is a prestressed concrete box girder bridge, designed as a continuous beam over multiple supports. The bridge was divided into five spans with a maximum span of 90 m, giving the whole system a sense of slenderness and lightness despite the construction type adopted.
To make the design proposal even more distinctive and appealing, an illuminated cover was planned over the central span.
The second design proposal studied a cable-stayed bridge with 2 towers. Various configurations of the stays and towers were designed, in order to best combine the structural and aesthetic aspects.
Applied Solutions
- Structural Design & Analysis